Apr 2026
Milestone

First field signal received

The project has crossed from simulation into observation. Live inputs are now arriving from outside the lab, giving the system its first real sense of atmosphere, timing, and texture.

Apr 2026
Infrastructure

Core platform standing

The central platform is online and stable, with the essential pieces now working together as a single instrument. The surrounding fieldwork can move faster because the spine is in place.

Apr 2026
Milestone

Field tooling ready

The practical machinery for expansion is ready: installation, recovery, and repeatable setup now take less ceremony and fewer assumptions than before.

Apr 2026
Milestone

Foundation complete

The first complete internal loop is in place and behaving as intended. What comes next is refinement, calibration, and learning how the system behaves under real sky rather than controlled conditions.